EXPERIENCE LEVEL: 7 YEARS
Architectural Design
R. Morgan Rolontz Architecture
New York City, March – September 2022
Private Residence, Upper East (Carnegie Hill)
Building Review Set: Set up a building review set and updated schedules for Managing Agent, revised set per redlines requested. Set up final submittal including existing, demo and proposed plans, construction details, RCP plan, energy analysis tabular chart, lighting calculation analysis tabular chart (wattage per fixture, allowable watts per square footage, etc.), plumbing demo and proposed plans, plumbing riser diagram location sheets and plumbing fixture/fittings and appliance schedule
Pricing Set: Continued setting up a comprehensive, full CD set and additional schedules for contractors including kitchen and bath construction details and millwork sections, details, elevation sections, and schedules for millwork, appliances, doors, finishes, etc. Set up submittal and bid letter and sent out package to 4 contractors
Private Residence, Upper East (Lenox Hill)
Site visit, field measure and verify existing conditions
Design Development set for Client: Generate existing conditions plan and four (4) proposed plans
Window Manufacturer Submittal: Set up interior elevations and window detail sheets for proposed scope of work on new casement windows
Building Review Set: Set up a building review set and updated schedules for Managing Agent, revised set per redlines requested. Set up final submittal including existing, demo and proposed plans, construction details, RCP plan, energy analysis tabular chart, lighting calculation analysis tabular chart (wattage per fixture, allowable watts per square footage, etc.), plumbing demo and proposed plans, plumbing riser diagram location sheets and plumbing fixture/fittings and appliance schedule. Coordinated with engineers on MEP drawing set sheets, cut sheets, and load letter
Private Residence, Upper East
Site visit, field measurements of existing conditions
Building Review Set: Set up a building review set and updated schedules for Managing Agent, revised set per redlines requested. Set up final submittal including existing, demo and proposed plans, construction details, RCP plan, energy analysis tabular chart, lighting calculation analysis tabular chart (wattage per fixture, allowable watts per square footage, etc.)
Building Review Response Set: Delegated answers to managing architect’s questions in word document, revised drawing set of redlines requested, collaborated on supplemental supporting documents ie. cut sheets.
Private Residence, West Village/Flatiron Area
Site visit and field measurements of existing conditions
Building Review Set: Set up a building review set and updated schedules for Managing Agent, revised set per redlines requested. Set up final submittal including existing, demo and proposed plans, construction details, RCP plan, energy analysis tabular chart, lighting calculation analysis tabular chart (wattage per fixture, allowable watts per square footage, etc.), plumbing demo and proposed plans, plumbing riser diagram location sheets and plumbing fixture/fittings and appliance schedule. Coordinate with Expeditor on Plot information, total construction, demo, electrical, plumbing cost calculations
Daily coordination with contractor and handling paperwork on COIs, Load Letters, Alteration Letter for building review set
Building Review Response Set: Revised submittal drawings per word document requests, attached required cut sheets, and revised comments in word doc
Private Residence, Midtown East
Site visit and field measurements of existing conditions
Building Review Set: Set up a building review set and updated schedules for Managing Agent, revised set per redlines requested. Set up final submittal including existing, demo and proposed plans, construction details, RCP plan, energy analysis tabular chart, lighting calculation analysis tabular chart (wattage per fixture, allowable watts per square footage, etc.), plumbing demo and proposed plans, plumbing riser diagram location sheets and plumbing fixture/fittings and appliance schedule
Coordinate with Expeditor on Plot information as well as total construction, demo, electrical, and plumbing cost calculations
Daily coordination with contractor and handling paperwork on COIs, Load Letters, Alteration Letter
Coordinated with engineers on specs for plumbing drawing development set
Building Review Response Set: Revised submittal drawings per word document requests, attached required cut sheets, and revised comments in word document
Private Residence, Connecticut
Pricing Set: Revision work only on second floor study elevations/partial plan layout and send to contractor
Private Residence, Midtown
Building Review Set: Revise set per redlines requested on lighting locations and switch lines in reflected ceiling plan and electrical plan, set up Plot Plan per Expeditor coordination
Private Residence, Upper West (Morningside Heights) Apt #1
Site visit, field verify existing conditions already generated and compare to engineer’s existing background drawings
Private Residence, Upper West (Morningside Heights) Apt #2
Site visit, field verify existing conditions
Set up existing background drawings – pending project
Private Residence, Upper West
Client Review: Updated/revised Paint schedule and added in 4 types of keypads in reflected ceiling plan
Private Residence, Hamptons
Client Review: Generated a footprint plan, full scale of client-sourced hanging swing chair
Private Residence, Connecticut
Pricing Set: Replicated hand-written marked redlines onto 4 full sets of Pricing set as well as digitally via Bluebeam PDF
Private Residence, Kips Bay/Flatiron Area
Pricing Set: Revised and updated pricing set, set up submittal with schedules and bid letter out to 4 contractors
Private Residence, Brooklyn
Set up exterior elevation sheet with placement for signage per contractor request for requirements during construction phase
Private Residence, Union Square/Washington Square/NoHo
Building Review Set: Coordinated and set up managing agent missing documents by sorting out files and emails into a more updated submittal package for managing agent office
Architectural Design
Jill Menoff Architect P.C.
Remote, New York City, October – November 2021
Residence, Carnegie Hill
15 story pre-war, RM (mixed res./comm.)
3,000 sf Phase 1 under construction, Phase 2 DD/Bid Set
Residence, Greenwich Village
6 story co-op, D4 (elevator co-op)
Drawing submittal to Building Management, Bid Set
Residence, Lincoln Center
6 story pre-war, R4 (res. unit in elevator bldg)
Specifications with local vendors, suppliers, manufacturers, showrooms
Residence, Upper West Side
(2) 16 story hi-rises, D4 (elevator co-op)
1,000 sf Bid Set, Building Management Set, and DOB Filing Set
Residence, Upper West Side
9 story pre-war co-op, D4 (elevator co-op)
1,800 sf under construction, Lighting and Power Plan on wall and surface mounted sconces, light load power calculations, revisions per contractor and architect revised dimensions
Design Competition Group Judge
National Kitchen and Bath Association
NKBA Design Competition
Puget Sound Chapter
45 submittal entries
Remote, May 2021
Certification
National Kitchen and Bath Association
NKBA Floor Plans & Specifications Specialist Badge
Remote, January 2021
Design Competition Group Judge
National Kitchen and Bath Association
NKBA Design Competition
Minnesota Chapter
45 submittal entries
Remote, August – September 2020
General Interior Design
River North Luxury High Rise
Independent
Chicago, IL January – November 2020
One Superior Place Studio, 1 Bath, 650 sf
One Superior Place 1 Bedroom, 1 Bath, 740 sf DD
One Superior Place 1 Bedroom, 1 Bath, 740 sf ID and Graphics Package
Architectural Design
Harding Partners
Architectural Designer
Chicago IL April 2019 – March 2020
Lloyd Lewis House Restoration
Frank Lloyd Wright original
Davenport House
Frank Lloyd Wright original with Garage, Exercise, Library
Kitchen and Bath
Studio Spicuzza
Architectural Designer
Merchandise Mart, Chicago, IL November 2017 – April 2019
Residence, Texas single family 2 story detached home
Residence, Lincoln Park 1 story vintage flat
Lannon Residence, Lincoln Park 1 story flat
Residence, Gold Coast 2.5 story brownstone
Residence, Northbrook 2 story attached townhome
West George Residence, Lincoln Park 2.5 story brownstone
Residence, Streeterville 2 story attached townhome
Lobby and Corridors
Studio Spicuzza
Architectural Designer
Merchandise Mart, Chicago, IL November 2017 – April 2019
Edgewater Park, Lakeview 12 story vintage condo midrise, corridor renovation
5 North Wabash, Loop area vintage midrise, corridor renovation
1000 Plaza, Gold Coast high rise tower, corridor renovations
1212 N. Lakeshore, Gold Coast 68 story, 2 high rise tower, corridor renovations
Architectural Work
HKS Architects, Inc.
Architectural Designer
Tampa, FL October 2006 – January 2008
Veranda Condominiums New Construction
DD and CD document packages of redlines and coordination; Comprehensive verifying of un-coordinated DD packageDrafted DD into CDs via updated redlines; Verified all old x-references linked into original drawings by re-aligning all levels of roof plans and exterior elevations; Verified all balcony widths, CJ locations, pre-cast notchings, roof plan perimeters, and set up a “clean drawing” command in eliminating duplicated line segments, purged overlapped layers, and duplicated linear dims; Set up a storefront window database of mullion dims, specs, additional sheets; Verified exterior cast stone trimmings on stone cladding by aligning exterior face with face of pre cast; Created roof details by drawing out its components