Healthcare

EXPERIENCE LEVEL – 2 YEARS

ProjectONE | Ohio State University Medical Campus Expansion Project
OSU Medical Campus Hospital Exploratory Exercise
Contractor with Design Consultant and HOK
Florida, 2010 – 2011

James Cancer & Critical Care Tower – Acute Care
Operational Flow Study of Patient Room Cleaning

Created an operational workflow presentation using Evidence Based Design approaches. Service Areas per Patient Room: EVS (storage for trash carts); AGV (carts for chemo, non-hazardous incinerator, recycled dock for pick-up; Soiled Linen (laundry chute for garments and linens)

Set up graphic analysis of 3 staff members to clean during routine, discharge and isolation scenarios.  Evaluated client needs. Site visits. Researched environmental-friendly products. Baseline vs. forecast placemaking.


McCampbell Hall Ambulatory Modifications 
Acute Care Facility Sample

Collaborated FF&E inventories for medical facility relocation using Evidence Based Design approaches. Inventory on existing departments relocating to McCampbell: Cramblett (Nephrology, OB/GYN, Infectious Disease Research, Surgery, Trauma and Burn); MCampbell (Endocrinology, Nisonger, Women’s Health Center); Gowdy (Women’s Health Center)

Created CAD blocks and tag items with material specifications, assessment data, and field measurements for inventory database. Created transfer package of modified floor plans. Database for future relocations as an e-reference tool.


Architectural Design
Dorsky Hodgson + Partners
Cleveland, OH February 2003 – September 2004

Friendship Village (FP)
Hill View Manor Retirement Community (CD)
Goodwin House West, Fairfax, Virginia (DD)
Kendal at Granville (DD, CD, FP)
Kendal at Longwood, Health Center (CD, B)
Montefiore Renovation (FP)
Porter Hills Presbyterian Village (DD)
Slovene Home for the Aged (PD, SD, DD)
St. Edward-The Village at St. Edward, Nursing Home Renovation Study (SD)
Sumner at Manor House (DD)
Sumner on Ridgewood (CD)
Sunset Village of Georgetown (DD)
Village at St. Edward Nursing Home (SD)


AutoCAD support per architect/engineer redlines (mechanical, plumbing, structural, food service, topographical maps, grading, door hardware sets, interior paint selections, millwork); Transfer of scanned sketches into DDs;
Set up life safety graphic symbols for fire safety sheets, drafted comprehensive package of all ADA equipment, toilet accessories for interior elevations, enlarged floor plans via ADA compliances; Designed block families of MEP equipment, glazing/door schedules via Excel; Drafted 12 pages of interior elevations from SD to final
* All projects: Graphics/Graphic Programming Response packages: 11×17 Response packages on all public, private program spaces, adjacencies, square footages, ADA requirements, and design issues; coordinated with interior designers and PMs specs; color rendered all floor plans and interior elevations
* All projects: Illustrator/Photoshop presentations of photographic images,
signage, furniture layouts, site plans, ext storefront selections, interior finishes
* All projects: Field investigation/observation surveys: verified existing
square footages and set up spreadsheet package of total gross for all spaces

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: